Dear All,
I have an issue as below
1.I have created a production order of qty=100 Kg
2.In route I have two operations(10th & 20 th).
3.Production Order Updated to Job Scheduling.
4.Production Order Updated to release.
5.I want to start production with 50 kg qty
6.In job card journal I want to post for 50 kg(10th operatrion).
7.The 50 kg qty which i posted in 10th operation,I want to post for 20 th Operation(after starting 20 th operation with 50 kg)
8.Then remaining 50 kg I want to start and post for 10th operation and post it(Job card).
9.After that ,50 kg I want to start for 20 th operation and post the job card.
Can any one of us give resolution for above mentioned scenario.
Thanks in advance.
NBSingh