Variants

Has anyone done any work with BOM Variants with Manufacturing 2.6 Eg One BOm with different colours etc Tim

The BOM versions have always struck me as being intended for engineering change control rather than variants because the start date is a key feature of them and because there is no standard link between item variants and BOM versions. Cheers John