How to Allocate Costs with ABC Method

is there a feasible way to make an ABC method allocation in Navision?

Hi Ümit There is no “standard” way of doing this from historical usage in Navision, it is used more for cycle counting on the Warehouse tab of the item card for slow, medium and fast moving stock - have a look.

Thanks Steven, i think it will be OK.