Hi
I have several Projects that have Beginning balances journals posted against them but they do not appear against the Cost Control or indeed in the Actual Costs Fact box - does anyone know what I must check for? This is a AX2012 R3 CU12 system.
I have checked from within the Project and the beginning balance journal is there so I am at a loss to explain it. Any ideas gratefully received.
Thanks