transfer of wip item of a PO with 2 intenal routingsline..

Hi,

i’'ve a finish good made with 2 rountings

10 cutting------on location 01 by work center A

20 assembly-----on location 02 by work center Y

The two work centers are internal (not subcontracting) but are dislocated in two different town.

After operation 10 i’ve to trasnfer the wip item from location A to Location B.

Does nobody know how can i handle this transfer ?

In italy localization we have the Subcontracting Granule that let manage the transfer of a wip item from A to y, where Y is a subcontracting work center…

I can’t find any solution with the standard utilities…

thanks in advice

ale