Hi,
i’'ve a finish good made with 2 rountings
10 cutting------on location 01 by work center A
20 assembly-----on location 02 by work center Y
The two work centers are internal (not subcontracting) but are dislocated in two different town.
After operation 10 i’ve to trasnfer the wip item from location A to Location B.
Does nobody know how can i handle this transfer ?
In italy localization we have the Subcontracting Granule that let manage the transfer of a wip item from A to y, where Y is a subcontracting work center…
I can’t find any solution with the standard utilities…
thanks in advice
ale