Hi,
How to manage Sub-finished products, within the Main Product (for Projects.)
Assume we have a Finished Product “F” to be delivered for a Project, “F” has Sub Finished product S1,S2 and S3.
The BOM for S1 is finalised and we can start the Procurement and eventually the Fabrication too.
But We don;t know the BOM for the S2 and S3, because we don;t have the Engineering Design and drawings yet.
How do we handle this scenario in AX?
Regards
Thomas Philipose