Run Master Planning from

Hi, Is there any difference between running Master plan Inside the Net requirements screen of released order vs running it through the periodic activities? Systme gives me different results and i’am wondering if i missed something. Thanks

Yes, the net requirements looks at the item, the batch looks at the item and its relations - so if it is consumed within production you would not see this in the net unless the top level was planned as you are only running it for the lower level specific item.

Thanks Adam.