Hi,
What is the best way to enter landed costs when doing a transfer between 2 sites when we use:
-
Standard Cost method
-
Average Cost method
Thanks
Hi,
What is the best way to enter landed costs when doing a transfer between 2 sites when we use:
Standard Cost method
Average Cost method
Thanks
The two elements of your question are not connected. The best way to enter landed costs on a transfer order is to use the Indian localization which has it as standard I believe. Then ensure the cost updates the inventory value, then account according to your account system (which would mean PPV or addition to cost).