To All NAV Expert
Please help me what should I do for secret recipe?
Assuming, production produce 1 FG compose of 3 Raw Materials. However, 1 raw material used was understated of qty per which the set up can be found in Production BOM.
i.e 1 Raw Material = 3 grams
2 Raw Mat = 50 grams
3 Raw Mat = 20 ml. but in fact the real RM to be used 50 ml. So, the cost of 30 ml. as secret recipe should be added to
FG.
Please advise.