Creation of master Plan for both static and Dynamic at the same time

Hi All,

We have a problem where the Master Planning is creating planned orders from Static and Dynamic Plan with the same quantities at the same time. I found two entries for the same Master Planner ID (MPO) and not sure why two planning records are getting generated. Also when i see in Dynamics Ax under Net Requirements only Master Plan 20 record is showing up and not Master Plan 10 (Static). Can some one what could be the problem here ?

Thanks in advance

How is it set in teh parameters between static and master. If you have the plan button and you cannot select 10 it would imply 10 does not exist or is not being created.