We are using AX 2009 with process manufacturing.
The scenario is - Raw material will be send for the Sub Contracting.
The outcome of that process would be two items - one “X” item of formula type and “Y” of type co-product.
My configuration is like this.
I have created a formula Item of Product Type - None ( "X " - item)
for that i have added the raw material, service item and a Co-Product(“Y” - Item).
And i have given some cost allocation percentage to Co -product. say 10%
Logically seeing the co - product cost will be 10% total cost (Raw material + service cost + over head if any).
But i got a requirement - that the service cost and over head cost should not be added to the cost of co-products.
Means the it should be 10% of the raw material cost.
Is this possible ?