Hi All,
I am new to AX. What is the best method to set up this case?
Machines A & B. Tasks they do are different. The machines can perform 2 tasks together, 1 task as individual machine.
- Task “a” & “b” done by both machine together.
- Task “b” done by “B” machine only.
- Task "a done by “A” machine only.
I need it to be set it up in such a way. One machine is booked, other machine not available for any tasks. The description work centre description to appear in proper way.
- to be machined by b machine only.
- to be machined by a machine only
- to be machined by both machines.
Any thoughts is much appreciated.