Hi,
how and where I can set in AX a waste that will be calculated for each operation.
That has to be the same amount in units (not in %) - the waste is not dependent from batch size but from complexity of the process.
the more operation the more waste you get. F.e:
case 1. production of 1000pcs has 3 operations
each needs 5 pieces for setup
case 2. production of 20 pcs has 6 operatios
also each of them needs 5 pcs for setup
where can i set that on operation ?
BR
RAKA