# Run Master Planning from

**URL:** <https://www.dynamicsuser.net/t/run-master-planning-from/50317>\
**Category:** User Forum\
**Created:** [January 15, 2014, 9:57pm UTC](https://www.dynamicsuser.net/t/run-master-planning-from/50317 "2014-01-15T21:57:56Z")\
**Posts on this page:** 3\
**Page:** 1

<div class="post-metadata">

**Author:** ![taty](https://avatars.discourse-cdn.com/v4/letter/t/ea5d25/32.png) [@taty](https://www.dynamicsuser.net/u/taty)\
**Post date:** [January 15, 2014, 9:57pm UTC](https://www.dynamicsuser.net/t/run-master-planning-from/50317/1 "2014-01-15T21:57:56Z")

</div>

Hi, Is there any difference between running Master plan Inside the Net requirements screen of released order vs running it through the periodic activities? Systme gives me different results and i’am wondering if i missed something. Thanks

---

<div class="post-metadata">

**Author:** ![AdamRoue](https://avatars.discourse-cdn.com/v4/letter/a/c37758/32.png) [@AdamRoue](https://www.dynamicsuser.net/u/AdamRoue)\
**Post date:** [January 16, 2014, 4:34pm UTC](https://www.dynamicsuser.net/t/run-master-planning-from/50317/2 "2014-01-16T16:34:20Z")

</div>

Yes, the net requirements looks at the item, the batch looks at the item and its relations - so if it is consumed within production you would not see this in the net unless the top level was planned as you are only running it for the lower level specific item.

---

<div class="post-metadata">

**Author:** ![taty](https://avatars.discourse-cdn.com/v4/letter/t/ea5d25/32.png) [@taty](https://www.dynamicsuser.net/u/taty)\
**Post date:** [January 18, 2014, 4:33am UTC](https://www.dynamicsuser.net/t/run-master-planning-from/50317/3 "2014-01-18T04:33:03Z")

</div>

Thanks Adam.