Project management using Job in Nav 2013

Hi

I want to use job module in Navision for external project.

I can capture resources (for labour charges) & items for material supplied to the project.

In case of purchased items I can make purchase order which has linkage with job and job task. However if I want to supply manufactured item (this item I am manufacturing at my works as per BOM) then I do not find any linkage between job and production order.

So I need a help on how can I link job with production order and despatch manufactured item to the project so that its cost can be captured in the project and invoice it from the project,

Thanks in advance.

The link is created when you run your planning. Here it will include items in the job planning lines.

Thank you Erik.

we selected usage link in Job planning lines for an production item where BOM was defined for the said item. It generated planned production order for the net qty after running create regenerative plan in planning worksheet.

However if we try to use usage link for a production item where BOM is not defined in the item card it did not generate any planned order. will it require to assign BOM for planning?

we also want to generate purchase requirement using usage links from the job. will it be possible? (we tried but failed)

Thank you.

Dinesh,

I must admit that I have never worked with the Job Module to Manufacturing Module, as one thing I almost never work with is that module. The job module on the other hand I have worked with quite a lot!

So maybe someone else can answer if the question?