Production order posting for machine centers

Hello,
While posting production orders using backward flush, I’ve noticed few things
When I use work center or combination of work center and machine center the process looks ok and all quantities are getting posted after changing status to finished.

However, if I use only machine centers it’s not posting last machine center from routing line. Why is it not posting the last machine center line while the status is changed to finished? Is there any setup we need to look into

Pl check on the image which I’ve attached, the operation no 30 is not posting while order is flushed via backward flushing. If I use work center or work center/machine combo operation no 30 would have posted in capacity ledger.

I’m assuming you are trying to backflush the capacity entries. Look on the specific Machine Center used on Op 30 and see if the flushing method is set to Backward.

Hi Ben,
All components and machine centers are set to backward flush