When I create a Production Order must I assign a Lot No. to the correspondant items that have Lot No. tracking when I create the production Order or can I do it later on? Or can I assign the Lot No. in the Consumption Journal later on???
If you talk about the components, then you would do it from the consumption journal. Normally you don’t know the actual lot number before you use it.
The exception being if it is required that you use a specific lot. Like within the pharmaceutical industry, its common that the customers may require you to use a specific lot no., they already have approved. In that case you specify it directly from the production order, so that they know which lot’s they have to use in the factory.
And that is as Lars writes, at matter of how you configure the item tracking code for the component. Here you can tell NAV where the Lot No. is required to be entered.