Hi,
I need to add a Fixed % of cost on the total cost of the Finished Product.before ENDING the Production
e.g Material cost 100
Labour 20
OH 10
TOTAL COST 130
I need to add 10% (fixed always) of the Total Cost which is 13, so that when I END my Production order the Finished product has a Total cost of 143. I did not find the setup for this.
Regards
Thomas Philipose