Preparing Formulation in Navision

Dear All,
I have a problem to implement formulation for a certain chemical product
used in the pharmaceutical before it is produced in the shopfloor.
Usually R&D will prepare it before goes to production plant.
Can I use production BOM for formulation so that I can calculate
raw material needed in a certain product.I thank you for answer beforehand.

Rgds,

Hi Andreas

Have a look at the Production BOM in tandem with simulated production orders. However I was under the impression you were buying a vertical add-on for your needs and I believe this would be covered in that as well.