Planned batch order

Hi,

In the Planned orders, i found a few items as Planned batch order. How does system determine whether it should be a Planned production order or Planned batch order?

I checked the item’ default order settings and found that DEFAULT ORDER TYPE = PRODUCTION

Thanx

TP

In the Released products form, Engineer fast tab you will find the Production type field, for batch production this field should equals to ‘Formula’ for discrete production should equals to ‘BOM’. I asume that this is how the system determine what to plan.