Managing molds capacity in prduction

Hi all,

We have composite industry and i would like to take into considration two resources at the same time (the manpower and the mold capacity) for my production.

Can i insert a mold in the BOM (the mold is reusable and not a material for consumation).

i tried to do it in the routing but in this case two resources will be required to be inserted the the routing line, and that look not reachable.

thanx for assistance