Job scheduling on multiple resources

Hi everybody,

I have a scenario where from a resource group composed of 5 resources, I need to job scheduling an order to only 3 of the 5 resources, I manage to job scheduling only in one of them by how should I proceed to achieve the scheduling in some of them? Manufacturing execution system is not used

Thanks a lot in advance!

Hi Hector

On the route for the resource is the number of resources set to three?