Job assigned to the machine

Suppose one operation number in the production route which contains a primary and a secondary operation, which means that part of them are done by “Human” and others are done by “Machine”.

When i run the “Job Scheduling” some of the job will be assigned to the machine. Even though these jobs should be done by the machine, but they probably will be report by human , right ?

So how to do this kind of job in the AX 2012 system?

Is it possible to make them appear in the “Job Registration” form, then the worker can report them?

many thanks.