In our case we do the manufacturing through BOM journals. We need to add overhead (electricity, water, rent) costs to BOMs. What is the best method to add overheads to a particular BOMs
Is dont use BOM journals the answer you are looking for? Overheads from the costing sheet are only applicable to production processing. If you use a BOM Journal it is a stock transaction alone, and in reality you do not care about the costing elements.