How implement routing

Hi everybody, How can I implement the routing setup in this case: Produces Item A - Qty 2 Preparation time : 5 mins Run time : 10 mins Total Processing time is 10 mins x 2 (qty) = 20 mins + 5 mins (preparation times) = 25 mins Thanks, Simon

Hi Simon Well if the run time is 10 minutes for 1 and this is standard and you have no lot size on your item then in the routing set the setup time = 5 with the setup time UOM = minutes, and the run time = 10 and the run time UOM = minutes, this will give you your 25 minutes.