Hi Friends
Is their a way to change the costing method in Navision 2009 SP1? I am aware of blocking the old item and creation of new item, but with 15000 items it looks very difficult.
Looking for feasible solution.
Thanks in advance
Hi Friends
Is their a way to change the costing method in Navision 2009 SP1? I am aware of blocking the old item and creation of new item, but with 15000 items it looks very difficult.
Looking for feasible solution.
Thanks in advance