Capacity of Resource Per Resource Group

I was wondering it if is possible to set up the capacity of a resource on the resource group it is associated with. For example, we have a machine which can fill as well as cap. It can also fill multiple volumes. We have resources set up for each of these (fill-small, fill-bulk, and cap). I was wondering if it is possible to specify on the resource group the resource’s capacity for each (50 an hour for fill-small, 40 an hour for fill-bulk and 75 an hour for cap).

You could define 1 and have it cascade and alter it per route depending upon the item and work center chosen.