# Calculating points in AX Questionnaires

**URL:** <https://www.dynamicsuser.net/t/calculating-points-in-ax-questionnaires/39921>\
**Category:** User Forum\
**Created:** [August 28, 2012, 12:40pm UTC](https://www.dynamicsuser.net/t/calculating-points-in-ax-questionnaires/39921 "2012-08-28T12:40:20Z")\
**Posts on this page:** 3\
**Page:** 1

<div class="post-metadata">

**Author:** ![teeflow](https://avatars.discourse-cdn.com/v4/letter/t/a87d85/32.png) [@teeflow](https://www.dynamicsuser.net/u/teeflow)\
**Post date:** [August 28, 2012, 12:40pm UTC](https://www.dynamicsuser.net/t/calculating-points-in-ax-questionnaires/39921/1 "2012-08-28T12:40:20Z")

</div>

Hi,

I’m trying to set up a questionnaire in AX2012 to calculate points based on answers selected. The answers to each question is from an Answer Group and each answer in the Answer Group has a point (from 1 - 5).

However, when the questionnaire is setup and I validate it prior to using the questionnaire I get the Infolog message “Max. points 0.00 is different from counted points 5.00”.

Also, when I set up text summaries for points ranges (Questionnaire\> Result group\> Points/texts) I get the Infolog message “From point 1.00, also lies in 1.00 to 2.00” where 1.00- - 2.00 are From and To points in a range I set up.

Please can anyone explain why i am getting these messages but most importantly how to get the questionnaire to work out a points total when the questionnaire is completed.

NB: I havent tried to run the questionnaire until I get the error messages sorted.

---

<div class="post-metadata">

**Author:** ![AdamRoue](https://avatars.discourse-cdn.com/v4/letter/a/c37758/32.png) [@AdamRoue](https://www.dynamicsuser.net/u/AdamRoue)\
**Post date:** [August 28, 2012, 1:54pm UTC](https://www.dynamicsuser.net/t/calculating-points-in-ax-questionnaires/39921/2 "2012-08-28T13:54:12Z")

</div>

Where is it on the menu in AX2012?

In AX2009 the result groups assigned to teh questionnarire gave you your maximum points.

---

<div class="post-metadata">

**Author:** ![teeflow](https://avatars.discourse-cdn.com/v4/letter/t/a87d85/32.png) [@teeflow](https://www.dynamicsuser.net/u/teeflow)\
**Post date:** [August 28, 2012, 2:41pm UTC](https://www.dynamicsuser.net/t/calculating-points-in-ax-questionnaires/39921/3 "2012-08-28T14:41:49Z")

</div>

Yes the result group does show the maximum points so I’m wondering why I get the errors. The steps I followed are:

In AX2012 go to Home\> Common\> Questionnaires\> Design\> Questionnaires. In the Questionnaires form there is a button on the toolbar called ‘Result groups’. There I created a result group for my questionnaire, set up my questionniare with four questions, each question with an Answer group consisting of answers of lnput type=‘alternative button’. With this done, my questionnaire is complete and I validate the questionnaire using the ‘Validate’ button on the Questionnaires form toolbar. That’s when the first error message is generated. The second error message only shows up if I define the points/text range on the result group.

Thanks
