Hi,
I have a question about BOM Consumption in AX 2009
Assume i have a BOM with 2 components as follows to produce 100 qty of the Finished Product
COMP1 100 qty
COMP2 100 qty
I am doing the production over a period of time and i am REPORTING AS FINISHED as follws
20
30
40
total 90 and I END the production
Now System says the consumption of both the components are 100 each, whereas on the shop floor i can see 10 qty of each component lying (10 for COMP1 and 10 for COMP2)
How can i setup my system so that it reflects the exact consumption?
regards