Cab some one point me in the right direction.
I am setting up a test environment in Contoso with Lean manufacturing.
I have set up the Production flows and validated ok
when I try to create a KanBan rule using first and last activity (there are 5 activities) and I generate the Kanban flow I get the message “there are no valid flows between the selected flows” my Production Flow and its setups looks fine so a bit lost in what I am doing incorrectly.
Can anyone give me some advice as to what area I should be looking at