# AX 2012 Fiscal Calendar Setup Question for 5 4 4 5 calendar

**URL:** <https://www.dynamicsuser.net/t/ax-2012-fiscal-calendar-setup-question-for-5-4-4-5-calendar/50555>\
**Category:** User Forum\
**Created:** [January 28, 2014, 12:58am UTC](https://www.dynamicsuser.net/t/ax-2012-fiscal-calendar-setup-question-for-5-4-4-5-calendar/50555 "2014-01-28T00:58:13Z")\
**Posts on this page:** 1\
**Page:** 1

<div class="post-metadata">

**Author:** ![dcervelli](https://sea1.discourse-cdn.com/flex023/user_avatar/www.dynamicsuser.net/dcervelli/32/7551_2.png) [@dcervelli](https://www.dynamicsuser.net/u/dcervelli)\
**Post date:** [January 28, 2014, 12:58am UTC](https://www.dynamicsuser.net/t/ax-2012-fiscal-calendar-setup-question-for-5-4-4-5-calendar/50555/1 "2014-01-28T00:58:13Z")

</div>

When I create a fiscal calendar in I can’t see how to get a 5 4 4 calendar. I can create a fiscal calendar for 12 periods with the starting date that I need.

The problem is that the calendars created are 30 days each from the date I entered and and not 5 4 4 calendars that I need.

1. Is there a way to create a 5 4 4 calendar and if so how?

2. If there isn’t a way, is there a way to manually enter a calendar or adjust the one that the wizard created?

Thanks