If i have 1 item, and that item can be produce using multiple machine (let say machine A & machine B).
If using machine A, capacity in 8 hour is 8000, but with machine B, capacity in 8 hour is 6000.
How the setup in AX, so in scheduling, AX will choose that 2 resource with each capacity?
So the scheduling can be more efficient